Biofuel plant install Largest EVER Bale Breaker

08 Feb 2016

The Largest Bale Breaker KME have ever Built!

Nicknamed the “millipede” by our engineers due to its length the brand new bale breaking system has been installed at a biofuel plant based in Lincoln for Ron Hull Group.

The System is to be fed with dirty straw that was deemed “unusable” by farmers, the system comprises of the huge walking floor leading to the bale breaker. The breaker breaks up the baled straw and passes it through to an Alvan Blanch dryer.

Its the 3rd machinery order from the plant

 

Bale breaker with longest walking floor for biofuel
Largest walking floor feeding KME breaker unit